Posts tagged IGP.
Time 8 Minute Read

Continuing its vanguard approach to environmental regulation, California is poised to incorporate Total Maximum Daily Load (TMDL)-specific requirements into its industrial storm water general permit (IGP). TMDLs are pollutant- and water body-specific and establish the maximum amount of a pollutant a water body can receive while meeting water quality standards. Once effective, these new requirements will provide additional avenues of attack for the already active Clean Water Act citizen suit docket.

Time 10 Minute Read

California is considering the first-in-the-nation general industrial stormwater permit incorporating Total Maximum Daily Load (TMDL)-related numeric action levels (TNALs) and numeric effluent limitations (NELs). These new standards have the potential to further ramp up federal Clean Water Act (CWA) citizen suit litigation. Under the State Water Resources Control Board’s (State Board) proposed amendment to its stormwater general industrial permit (IGP), a “Responsible Discharger” whose stormwater discharge exceeds an applicable NEL automatically will be in violation of the IGP. Unless it complies with the permit’s existing exceedance response action process, it also will be in non‑compliance if its discharge exceeds an applicable TNAL.

Recognizing these consequences, and the difficulties some dischargers have complying with existing IGP requirements, the State Board is proposing two alternative compliance options. Touted as an effort to promote green infrastructure and water reuse, these options could revamp how industry manages stormwater. Both alternatives involve capture and reuse of the runoff from the 85th percentile 24-hour storm event, with the difference being the stormwater retention location. Under the “on-site” option, retention occurs at the facility. Under the “off-site” option, retention occurs at the local publicly owned treatment works (POTW).

Search

Subscribe Arrow

Recent Posts

Categories

Tags

Authors

Archives

Jump to Page