Building on the Biden Administration’s strategy to achieve net-zero greenhouse gas (GHG) emissions by 2050, and as world leaders begin gathering in Glasgow, Scotland, yesterday, the US Environmental Protection Agency (EPA) issued a proposal under the Clean Air Act to significantly expand regulation of methane from oil and gas operations in the United States. The proposal—issued in conjunction with measures proposed by at least five other cabinet-level agencies to address GHG emissions—is part of President Biden’s “whole of government” approach to addressing climate change and represents EPA’s most ambitious regulatory effort to date to curb oil and gas sector emissions. EPA estimates compliance costs of $12 billion (present value, 3% discount rate) for existing sources, which it indicates would be offset by an estimated $4.7 billion (present value) through the capture of natural gas pursuant to the fugitive emission requirements in the proposal.
Four key areas of the proposal to understand are:
- Increasing Stringency of Current Standards for New/Modified/Reconstructed Facilities: EPA proposes to increase stringency of the current new source performance standards (NSPS) for GHGs and volatile organic compounds (VOCs) for the Crude Oil and Natural Gas source category. The proposed standards would be codified in a new section of the federal regulations, 40 C.F.R. Part 60, Subpart OOOOb (“Quad Ob”). At the end of this post is EPA’s Table 2 from the proposal summarizing the new proposed standards in Quad Ob. EPA’s proposal for new, modified, and/or reconstructed sources in oil and natural gas would expand and make more stringent regulatory requirements currently in place under the NSPS 40 C.F.R. Part 60, Subparts OOOO (“Quad O”) and OOOOa (“Quad Oa”).
In a unique, but not wholly unprecedented approach, EPA has withheld at this time the language that it would include in a regulation if one were issued. Instead, it seeks comment and states that it will issue a supplemental proposal in 2022 to make that language available for public comment. This approach could have been chosen for any one or a combination of the following reasons:
-
- Time: The proposal is being issued “quickly” as regulatory proposals go, less than a year after the administration took office—typically, it would take at least two years to issue a nearly 600-page proposed regulatory action, and even accounting for the fact that the Administration is building on prior actions, much of it is brand new. Thus, there simply may not have been time to develop the language.
- Complexity: The number of changes being suggested and their interaction with a series of regulatory provisions that previously were issued, rescinded, subject a Congressional Review Act (CRA) action, means that the task is challenging.
- OMB: All regulatory proposals and final actions require review by the Office of Management and Budget’s Office of Information and Regulatory Affairs (OMB and OIRA). This proposal underwent an expedited review at OMB, passing through the system in less than 60 days. Although OMB is charged with completing reviews in 90 days, it is far more typical to see proposals take upwards of 120 days to clear OMB. For such a massive regulatory package, the complexity of adding this language could have been a factor.
- Signal Openness to Key Constituencies: By not proposing regulatory language and seeking comment on the scope of its ultimate proposal, EPA signals potentially to others that there may be additional opportunities to push the proposal further.
EPA invites public input about the proposed modified standards and about additional sources that may further reduce methane and VOC emissions from the oil and natural gas sector. See here for a table that EPA issued listing the sources covered under the current and proposed standards.
- Regulating Existing Oil and Gas Sources Currently Covered by State Rules or Addressed by Industry Best Practices But Not Previously Regulated by EPA: Section 111, which authorizes NSPS—the new source performance standards, under subsection (b)—can also lead to and may require regulation of existing sources, which would occur pursuant to subsection (d) of Section 111. States have been regulating existing oil and gas sources extensively for many years, but the federal government has not yet taken action on them, with some stakeholders viewing federal regulation as duplicative of and potentially conflicting with already sound state programs and other stakeholders seeking uniformity and a federal right to bring citizen enforcement of standards, which does not generally exist under state regulations.
EPA now proposes Emissions Guidelines (EGs) for existing sources in the Crude Oil and Natural Gas source category for states to follow in developing, submitting, and implementing state plans to establish existing source performance standards to limit GHGs. The proposed EGs would reside in a new section of the federal regulations, 40 C.F.R. Part 60, Subpart OOOOc (“Quad Oc”). The proposed EGs include “presumptive standards” for the same types of facilities that are covered by the NSPS, with the exception of well completions and liquids unloading. According to the proposal, the presumptive standards are intended to provide states with a starting point in their plans, which EPA believes “reflect the emission reductions achievable by applying the Best System of Emission Reduction (BSER) that the EPA Administrator determines has been adequately demonstrated.” At the end of this post are EPA’s Tables 3, 20, and 21 from the proposal summarizing the proposed technology determinations and presumptive standards for GHGs from existing facilities in Quad Oc.
On the whole, the proposed presumptive existing source standards generally mirror the new source standards EPA is proposing for new, modified and reconstructed sources. And as noted above, those new source standards ratchet up the stringency of what is already in place for the sector.
To be sure, many companies are already implementing the types of programs that would be called for by these regulations, either voluntarily or under state and local regulations. But even where companies are already implementing in practice the core elements of a proposed regulation, such as leak detection and repair, the transformation of such elements into enforceable obligations subject to compliance certifications “ups the compliance risk ante”—companies need to review the proposal carefully to ensure that when it comes to complying with the detailed requirements, they understand what will be required and what they must certify to the government they have done (and report deviations) on an annual basis. This task is somewhat complicated by the fact that regulatory language is not available at this time, which is a critical aspect of analyzing the impacts of a rule. At the same time, regulated entities can treat this as an opportunity for to provide input on key aspects of how EPA should craft the regulatory language for the existing sources to take into account practical compliance concerns from the outset. And when the proposed regulation text is made available in early 2022, careful examination and comment will be in order and a key to success in complying with whatever regulations are issued. Finally, though state plans may differ from the federal existing source emissions guidelines, in practice, we see states largely adopt the federal language, which sets a stringency floor for state plans.
- Amendments to the 2020 Technical Rule: Another important aspect of the proposal is that it would revise Quad Oa to (1) rescind the revisions to the VOC fugitive emissions monitoring frequencies at well sites and gathering and boosting compressor stations in the Technical Rule as EPA believes “those revisions were not [well] supported” and (2) adjust other modifications made in the Technical Rule to address implementation issues that result from the CRA disapproval of the Policy Rule. These changes are important and may have more practical implications worth addressing in comments than the switch regarding regulation of methane from the sector, as many companies have publicly stated that they favor methane regulation and are already subject to extensive regulation at the state level.
- Implementing the Congressional Review Act Resolution That Repealed the Trump Administration’s 2020 Policy Rule: In September 2020, EPA issued a regulation that rescinded the Obama Administration’s determinations regarding the appropriateness of regulating the Transportation and Storage segment of the oil and gas sector, while supporting the propriety of regulating the Processing and Production segment for VOCs, but not for GHGs (again due largely to statutory process concerns). The crux of that action was a determination that the proper procedure had not been followed under Section 111 to regulate Transportation and Storage activities at all and to regulate methane from the Production and Processing segment, though such a procedure could be followed in the future and if it were, such regulations could be issued. This action was commonly referred to as the “2020 Policy Rule,” in part because it was issued in tandem with a “2020 Technical Rule” that made several changes to the Quad O and Quad Oa regulations related to implementation of the requirements that had been issued previously.
In June 2021, pursuant to a Congressional Review Act (CRA) resolution, the 2020 Policy Rule was rescinded. The 2021 CRA resolution nullified the 2020 Policy Rule and thereby reinstated regulation of VOC and methane emissions for the Transportation and Storage segment and for methane emissions for the Production and Processing segments. The 2020 Technical Rule was not a part of the CRA resolution. The proposal on November 2 states that it aims to implement in regulatory language the effect of the CRA Resolution rescinding the 2020 Policy Rule, which largely involves adding the word “GHGs” as well as deleting Transportation and Storage segment definitions and applicability provisions back into the rule. While seemingly straightforward, the impacts of what appear to be simple changes are more complex than first meets the eye, as reflected in an EPA Q&A document issued earlier this summer.
Other Notable Aspects of the Proposal for Consideration
- Provision for empowering local / citizen inspectors. EPA is requesting comments on approaches to provide substantial new abilities for local communities to engage in compliance matters for oil and gas sources. The proposal references a Methane Detection Technology Workshop where state and local governments, industry, researchers, and NGOs identified advanced technologies to better understand the detection of, source of, and factors that lead to large emission events. EPA is seeking comment on how to increasingly use these technologies to help identify and remediate large emission events. Specifically, EPA seeks comments on how to evaluate, design, and implement a program whereby communities and others could identify large emission events and provide that information to owners and operators for subsequent investigation and remediation of the event. EPA envisions “a program for finding large emission events” that would require emissions above a “defined threshold by a community, a Federal or State agency, or any other third party, [where] the owner or operator would be required to investigate the event, do a root cause analysis, and take appropriate action to mitigate the emissions, and maintain records and report on such events.” Proposal at 248-249 (pre-publication).
- Environmental Justice Considerations. One of the hallmarks of the administration has been its stated commitment to environmental justice (EJ), which is defined as “fair treatment and meaningful involvement of all people regardless of race, color, national origin, or income with respect to the development, implementation and enforcement of environmental laws, regulations, and policies.” Fair treatment means, “no group of people should bear a disproportionate share of the negative environmental consequences resulting from industrial, governmental, and commercial operations or policies.” Meaningful involvement means that people have an opportunity to participate in decisions about activities that may affect their environment and/or health, such contribution can influence the regulatory agency’s decision, community concerns will be considered in the decision-making process, and decision-makers will seek out and facilitate the involvement of those potentially affected.
With respect to specific EJ benefits of the proposal, EPA provides an EJ Fact Sheet which indicates that if finalized, EPA is “confident that” it “would improve public health protection in communities living near oil and gas facilities, including communities with [EJ] concerns.” The EJ Fact Sheet also cites reductions in “VOCs, which contribute to harmful smog and fine particle pollution” and “air toxics” benefits. Although a detailed assessment of community-level benefits is not included, EPA states that it conducted a “baseline” analysis to determine if certain EJ concerns existed, which indicated that Hispanic populations, Native Americans, and children 17 and younger may experience disproportional exposures to ozone pollution from VOC emissions from the oil and natural gas industry. EPA affirmatively seeks comment on “key assumptions used in the [EJ] analysis” and new information to conduct a more detailed “analysis of risk in the future.”
To meet the meaningful participation aspect of the EJ definition, on November 16-17, EPA is conducting training that will include details of the oil and gas production process, an overview of the proposed rule, panel discussions with EJ communities and tribes, and explanations of how to engage effectively in the regulatory process.
And, when state plans are eventually adopted, the regulations would require states to hold at least one public hearing on the plan before submitting to EPA for approval. The proposal also would require states to undertake meaningful outreach and engagement with overburdened and underserved communities during plan development.
- Proposed BSER and Proposed Standards of Performance for GHGs and VOCs. The proposal details a Best System of Emission Reductions (BSER) determination and related standards of performance for new, modified, and reconstructed sources under the new provisions at Quad Ob and Quad Oc. These include notable changes from the current standards, including a “co-proposal” to allow well sites with total site-level baseline methane emissions of 3 tpy or greater and less than 8 tpy to conduct semiannual, rather than quarterly, monitoring.
- Analysis of Costs and benefits. EPA projects emissions reductions, costs, and benefits that may result from the proposal in its Regulatory Impact Analysis (RIA), which covers the period from 2023 to 2035. There are a number of issues ripe for comment in the RIA, including EPA’s reliance on the Technical Support Document for the Social Cost of Carbon developed earlier this year to estimate global social benefits of methane emission reductions expected from the proposed rule. In addition, we note that the estimated costs associated with the proposal exceed the estimated costs of the Clean Power Plan finalized during the Obama Administration. As mentioned above, EPA’s RIA estimates compliance costs of $12 billion (present value) for existing sources under the proposed Quad Oc (3% discount rate) and that these compliance costs would be offset by product recovered worth an estimated $4.7 billion (present value) through the capture of natural gas in compliance with the fugitive emission requirements in the proposal. While the gross numbers are of interest, perhaps greater insight can be obtained by reviewing EPA’s numerous standard-specific cost estimates (e.g., dollars per ton of methane reduced). Companies should review these values to assess whether their cost experience is likely to match up with EPA’s estimates as it is these values that serve as the building blocks for the costs. Similarly, they rely on estimated reductions that would be credited to this regulatory action. Thus, if companies have information on current and projected emissions effects, those would be appropriate subjects for comment on the proposal.
- What to Expect on Timing and Scope. In any ambitious rulemaking such as this one, a key consideration for the sponsoring administration is how many of its regulatory objectives may be accomplished within the timeframe available. EPA has moved quickly on this proposal by issuing it within a mere nine months of President Biden’s inauguration. Nonetheless, much more work remains to be done to establish a final rule by the year-end 2022 goal. Due to the complexity and breadth of the proposal, requests for extensions of the comment period can be expected, and with most such proposals, at least some extensions are typically granted (e.g., 30 or 60 days). The administration will need to prioritize not only among rulemakings (i.e., other regulatory topics on its agenda), but also within each rulemaking, and of course, needs to consider whether it can also move a final rule through litigation, to avoid the current reconsideration, rule re-issuance, and litigation vicious cycle that inevitably occurs. At least some delay could occur since EPA has not proposed regulatory language for either Quad Ob or Quad Oc. Those actions will require a supplemental proposed rule, with the attendant requirements for OMB review and public comment, including potentially public outreach to tribal and EJ communities. EPA also states that it anticipates including in this supplemental proposal new regulations that would cover additional sources in the source category (e.g., abandoned wells, pipeline pigging operations and other pipeline blowdowns, tank truck loading operations, etc.), based upon information and comment collected in response to the notice on November 3, the final actions for the sector may be staged, with some aspects being finalized, while others are undergoing the required rulemaking process to become regulatory requirements.
Deadlines and Comments: Comments on the proposal are due within 60 days of Federal Register publication. A 2to 3 day virtual public hearing is scheduled for 15 days after publication, and the deadline to register to speak is 9 days after publication.
Specific Comment Requests
Although EPA seeks public comment on all aspects of the proposal to enable the Agency to develop a final rule that, consistent with the Agency’s responsibilities under CAA Section 111, “achieves the greatest possible reductions in methane and VOC emissions while remaining achievable, cost-effective, and conducive to technological innovation.” EPA also specifically requests public comment on certain “key areas” of the proposal, including the following:
-
- Finding and repairing leaks (fugitive emissions). EPA seeks input on a number of issues related to the comprehensive monitoring program included in the proposal, including information on available advanced monitoring technologies, ways to ensure fugitive emissions surveys identify malfunctions and large emissions sources that must be repaired, and whether to adjust repair requirements based on the severity of emissions, among other things.
- Transition to Zero-Emitting Pneumatic Controllers. EPA seeks input on potential control options that could demonstrate compliance with a standard of zero-emitting pneumatic controllers, and information on specific functional needs that would require a low-bleed or intermittent controller.
- Eliminating Venting of Associated Gas from Oil Wells. EPA seeks input on various aspects of its proposal to eliminate venting of associated gas from oil wells and to require this gas to be routed to a sales line where available or, where a sales line is not available, to use the gas for onsite power or another useful purpose, or to route it to a flare or control device that reduces methane and VOCs by 95 percent.
- Strengthening Requirements for Storage Tanks. EPA seeks input on a number of issues related to its proposal to add tank batteries to the definition of facilities that must reduce VOC and methane emissions.
- Broadening Types of Regulated Pneumatic Pumps. Related to its proposal to expand current requirements for new pneumatic pumps to include all natural gas-driven diaphragm and piston pumps in the production segment of the industry, and diaphragm pumps in the transmission and storage segment, EPA seeks input on the extent to which these pumps are used in the natural gas transmission and storage segments and whether it is technically feasible to require the use of zero-emitting pneumatic pumps at new and existing facilities with access to electric power or solar power.
- Evaluating Additional Sources of Pollution. EPA seeks input relevant to its evaluation of whether to include a number of additional sources within the scope of NSPS regulation, including abandoned and unplugged wells, pipeline pigging operations, and tank truck loading operations. EPA also seeks comment on opportunities that may exist to improve performance and minimize malfunctions at flares.
- Establishing Existing Source Standards in State Plans. EPA seeks input on various aspects of the proposal related to state plans under the proposed EGs, including watts that existing state programs can be adopted into state plans under the EGs and how state plans that regulate both sources covered by the proposed EGs and sources not covered by the proposed EGs could be tailored to meet the requirements of the proposal.
After Federal Register publication, the docket will be available and the proposal states that there will be a memorandum with additional specific comment requests by section and topic.
* * *
EPA’s November 2nd action represents the latest chapter in a multi-decadal effort to define the oil and natural gas source category regulated under the NSPS and to set appropriate standards for this category. The current effort is the most ambitious to date, and, despite EPA’s optimistic projection of having a final rule in place by the end of 2022, the realities of the rulemaking process and what is notably absent from this proposal indicate that there may be phases of rulemaking. Even though many companies and trade associations have supported and continue to support methane regulation, the details of the regulatory provisions matter. It is important that they actually implement the stated objectives, that companies can understand them and achieve compliance with them, and that the costs are appropriately reflected and the benefits accurately characterized. The legal issues raised under the Clean Air Act are also important because even where the policy result generates consensus, it is important that legal principles upon which those policy results are based are sound, as each regulatory action can be cited as precedent on legal issues for future actions, on which such consensus may not exist.
Thus, with the proposal’s scope and the significant issues it presents for the regulated community—including cost-effectiveness, technical feasibility, and implementation burden—it will be particularly important for industry to offer technical expertise and practical input during the rulemaking process to guide final rule development and to ensure the development of a robust administrative record on the key issues.
TABLE 2 FROM EPA METHANE PROPOSAL: SUMMARY OF PROPOSED BSER AND PROPOSED STANDARDS OF PERFORMANCE FOR GHGS AND VOC (NSPS OOOOb)
Affected Source | Proposed BSER | Proposed Standards of Performance for GHGs and VOCs |
Fugitive Emissions: Well Sites with Baseline Emissions >0 to <3 tpy1 Methane. |
Demonstrate actual site emissions are reflected in calculation. | Perform survey to verify that actual site emissions are reflected in calculation. |
Fugitive Emissions: Well Sites ≥3 tpy Methane. | Monitoring and repair based on quarterly monitoring using OGI. |
Quarterly OGI monitoring following Appendix K. (Optional quarterly EPA Method 21 monitoring with 500 ppm defined as a leak). First attempt at repair within 30 days of finding fugitive emissions. Final repair within 30 days of first attempt. |
(Co-proposal) Fugitive Emissions: Well Sites with Baseline Emissions ≥3 to <8 tpy Methane. |
Monitoring and repair based on semiannual monitoring using OGI. |
Semiannual OGI monitoring following Appendix K. (Optional semiannual EPA Method 21 monitoring with 500 ppm defined as a leak). First attempt at repair within 30 days of finding fugitive emissions. Final repair within 30 days of first attempt. |
(Co-proposal) Fugitive Emissions: Well Sites with Baseline Emissions ≥8 tpy Methane. | Monitoring and repair based on quarterly monitoring using OGI2. |
Quarterly OGI monitoring following Appendix K. (Optional quarterly EPA Method 21 monitoring with 500 ppm3 defined as a leak). First attempt at repair within 30 days of finding fugitive emissions. Final repair within 30 days of first attempt. |
Fugitive Emissions: Compressor Stations. | Monitoring and repair based on quarterly monitoring using OGI. |
Quarterly OGI monitoring following Appendix K. (Optional quarterly EPA Method 21 monitoring with 500 ppm defined as a leak). First attempt at repair within 30 days of finding fugitive emissions. Final repair within 30 days of first attempt. |
Fugitive Emissions: Well Sites and Compressor Stations on Alaska North Slope. | Monitoring and repair based on annual monitoring using OGI. |
Annual OGI monitoring following Appendix K. (Optional annual EPA Method 21 monitoring with 500 ppm defined as a leak). First attempt at repair within 30 days of finding fugitive emissions. Final repair within 30 days of first attempt. |
Fugitive Emissions: Well Sites and Compressor Stations. | (Optional) Screening, monitoring, and repair based on bimonthly screening using an advanced measurement technology and annual monitoring using OGI. | (Optional) Alternative bimonthly screening with advanced measurement technology with annual OGI monitoring following Appendix K. |
Storage Vessels: A Single Storage Vessel or Tank Battery with PTE4 of 6 tpy or More of VOC. | Capture and route to a control device. | 95 percent reduction of VOC and methane. |
Pneumatic Controllers: Natural Gas Driven that Vent to the Atmosphere. | Use of zero-emissions controllers. | VOC and methane emission rate of zero. |
Pneumatic Controllers: Alaska (at sites where onsite power is not available - continuous bleed natural gas driven). | Installation of low-bleed pneumatic controllers. | Natural gas bleed rate no greater than 6 scfh5. |
Pneumatic Controllers: Alaska (at sites where onsite power is not available – intermittent natural gas driven). | Monitor and repair through fugitive emissions program. | OGI monitoring and repair of emissions from controller malfunctions. |
Well Liquids Unloading. | Perform liquids unloading with zero methane or VOC emissions. If this is not feasible for safety or technical reasons, employ best management practices to minimize venting. |
Each affected well that unloads liquids employ techniques or technology(ies) that eliminate or minimize venting of emissions during liquids unloading events to the maximum extent. Co Proposal Options: Option One- Affected facility would be defined as every well that undergoes liquids unloading. -If the method is one that does not result in any venting to the atmosphere, maintain records specifying the technology or technique and record instances where an unloading event results in emissions. -For unloading technologies or techniques that result in venting to the atmosphere, implement BMPs6 to ensure that venting is minimized. -Maintain BMPs as records, and record instances when they were not followed. Option Two - Affected facility would be defined as every well that undergoes liquids unloading using a method that is not designed to eliminate venting. -Wells that utilize non-venting methods would not be affected facilities that are subject to the NSPS OOOOb. Therefore, they would not have requirements other than to maintain records to document that they used non- venting liquids unloading methods. -The requirements for wells that use methods that vent would be the same as described above under Option 1. |
Wet Seal Centrifugal Compressors (except for those located at single well sites). | Capture and route emissions from the wet seal fluid degassing system to a control device or to a process. | Reduce emissions by 95 percent. |
Reciprocating Compressors (except for those located at single well sites). | Replace the reciprocating compressor rod packing based on annual monitoring (when measured leak rate exceeds 2 scfm7) or route emissions to a process. | Replace the reciprocating compressor rod packing when measured leak rate exceeds 2 scfm based on the results of annual monitoring or collect and route emissions from the rod packing to a process through a closed vent system under negative pressure. |
Pneumatic Pumps: Natural Gas Processing Plants. | A natural gas emission rate of zero. | A natural gas emission rate of zero from diaphragm and piston pneumatic pumps. |
Pneumatic Pumps: Production Segment. | Route diaphragm and piston pneumatic pumps to an existing control device or process. | 95 percent control of diaphragm and piston pneumatic pumps if there is an existing control or process on site. 95 percent control not required if (1) routed to an existing control that achieves less than 95 percent or (2) it is technically infeasible to route to the existing control device or process. |
Pneumatic Pumps: Transmission and Storage Segment. | Route diaphragm pneumatic pumps to an existing control device or process. |
95 percent control of diaphragm pneumatic pumps if there is an existing control or process on site. 95 percent control not required if (1) routed to an existing control that achieves less than 95 percent or (2) it is technically infeasible to route to the existing control device or process. |
Well Completions: Subcategory 1 (non-wildcat and non-delineation wells). |
Combination of REC8 and the use of a completion combustion device. |
Applies to each well completion operation with hydraulic fracturing. REC in combination with a completion combustion device; venting in lieu of combustion where combustion would present safety hazards. Initial flowback stage: Route to a storage vessel or completion vessel (frac tank, lined pit, or other vessel) and separator. Separation flowback stage: Route all salable gas from the separator to a flow line or collection system, re-inject the gas into the well or another well, use the gas as an onsite fuel source or use for another useful purpose that a purchased fuel or raw material would serve. If technically infeasible to route recovered gas as specified above, recovered gas must be combusted. All liquids must be routed to a storage vessel or well completion vessel, collection system, or be re-injected into the well or another well. The operator is required to have (and use) a separator onsite during the entire flowback period. |
Well Completions: Subcategory 2 (exploratory and delineation wells and low-pressure wells). | Use of a completion combustion device. |
Applies to each well completion operation with hydraulic fracturing. The operator is not required to have a separator onsite. Either: (1) Route all flowback to a completion combustion device with a continuous pilot flame; or (2) Route all flowback into one or more well completion vessels and commence operation of a separator unless it is technically infeasible for a separator to function. Any gas present in the flowback before the separator can function is not subject to control under this section. Capture and direct recovered gas to a completion combustion device with a continuous pilot flame. For both options (1) and (2), combustion is not required in conditions that may result in a fire hazard or explosion, or where high heat emissions from a completion combustion device may negatively impact tundra, permafrost, or waterways. |
Equipment Leaks at Natural Gas Processing Plants. | LDAR with bimonthly OGI. | LDAR with OGI following procedures in Appendix K. |
Oil Wells with Associated Gas. | Route associated gas to a sales line. If access to a sales line is not available, the gas can be used as an onsite fuel source, used for another useful purpose that a purchased fuel or raw material would serve, or routed to a flare or other control device that achieves at least 95 percent reduction in methane and VOC emissions. | Route associated gas to a sales line. If access to a sales line is not available, the gas can be used as an onsite fuel source, used for another useful purpose that a purchased fuel or raw material would serve, or routed to a flare or other control device that achieves at least 95 percent reduction in methane and VOC emissions. |
Sweetening Units. | Achieve SO2 emission reduction efficiency. | Achieve required minimum SO2 emission reduction efficiency. |
TABLE 3 FROM EPA METHANE PROPOSAL: SUMMARY OF PROPOSED BSER AND PROPOSED PRESUMPTIVE STANDARDS FOR GHGS FROM DESIGNATED FACILITIES (EG OOOOc)
Designated Facility | Proposed BSER | Proposed Presumptive Standards for GHGs |
Fugitive Emissions: Well Sites >0 to <3 tpy Methane. | Demonstrate actual site emissions are reflected in calculation. | Perform survey to verify that actual site emissions are reflected in calculation. |
Fugitive Emissions: Well Sites ≥3 tpy Methane. | Monitoring and repair based on quarterly monitoring using OGI. |
Quarterly OGI monitoring following Appendix K. (Optional quarterly EPA Method 21 monitoring with 500 ppm defined as a leak). First attempt at repair within 30 days of finding fugitive emissions. Final repair within 30 days of first attempt. |
(Co-proposal) Fugitive Emissions: Well Sites ≥3 to <8 tpy Methane. |
Monitoring and repair based on semiannual monitoring using OGI. |
Semiannual OGI monitoring following Appendix K. (Optional semiannual EPA Method 21 monitoring with 500 ppm defined as a leak). First attempt at repair within 30 days of finding fugitive emissions. Final repair within 30 days of first attempt. |
(Co-proposal) Fugitive Emissions: Well Sites ≥8 tpy Methane. |
Monitoring and repair based on quarterly monitoring using OGI. |
Quarterly OGI monitoring following Appendix K. (Optional quarterly EPA Method 21 monitoring with 500 ppm defined as a leak). First attempt at repair within 30 days of finding fugitive emissions. Final repair within 30 days of first attempt. |
Fugitive Emissions: Compressor Stations. | Monitoring and repair based on quarterly monitoring using OGI. |
Quarterly OGI monitoring following Appendix K. (Optional quarterly EPA Method 21 monitoring with 500 ppm defined as a leak). First attempt at repair within 30 days of finding fugitive emissions. Final repair within 30 days of first attempt. |
Fugitive Emissions: Well Sites and Compressor Stations on Alaska North Slope. | Monitoring and repair based on annual monitoring using OGI. |
Annual OGI monitoring following Appendix K. (Optional annual EPA Method 21 monitoring with 500 ppm defined as a leak). First attempt at repair within 30 days of finding fugitive emissions. Final repair within 30 days of first attempt. |
Fugitive Emissions: Well Sites and Compressor Stations. | (Optional) Screening, monitoring, and repair based on bimonthly screening using an advanced measurement technology and annual monitoring using OGI. | (Optional) Alternative bimonthly screening with advanced measurement technology with annual OGI monitoring following Appendix K. |
Storage Vessels: Tank Battery with PTE of 20 tpy or More of Methane. | Capture and route to a control device. | 95 percent reduction of methane. |
Pneumatic Controllers: Natural Gas Driven that Vent to the Atmosphere. | Use of zero-emissions controllers. | VOC and methane emission rate of zero. |
Pneumatic Controllers: Alaska (at sites where onsite power is not available -continuous bleed natural gas driven). | Installation of low- bleed pneumatic controllers. | Natural gas bleed rate no greater than 6 scfh. |
Pneumatic Controllers: Alaska (at sites where onsite power is not available -intermittent natural gas driven). | Monitor and repair through fugitive emissions program. | OGI monitoring and repair of emissions from controller malfunctions. |
Wet Seal Centrifugal Compressors (except for those located at single well sites). | Capture and route emissions from the wet seal fluid degassing system to a control device or to a process. | Reduce emissions by 95 percent. |
Reciprocating Compressors (except for those located at single well sites). | Replace the reciprocating compressor rod packing based on annual monitoring (when measured leak rate exceeds 2 scfm) or route emissions to a process. | Replace the reciprocating compressor rod packing when measured leak rate exceeds 2 scfm based on the results of annual monitoring, or collect and route emissions from the rod packing to a process through a closed vent system under negative pressure. |
Pneumatic Pumps: Natural Gas Processing Plants. |
A natural gas emission rate of zero. | Zero natural gas emissions from diaphragm and piston pneumatic pumps. |
Pneumatic Pumps: Locations Other Than Natural Gas Processing Plants. | Route diaphragm pumps to an existing control device or process. |
95 percent control of diaphragm pneumatic pumps if there is an existing control or process on site. 95 percent control not required if (1) routed to an existing control that achieves less than 95 percent or (2) it is technically infeasible to route to the existing control device or process. |
Equipment Leaks at Natural Gas Processing Plants. | LDAR with bimonthly OGI. | LDAR with OGI following procedures in Appendix K. |
Oil Wells with Associated Gas. | Route associated gas to a sales line. If access to a sales line is not available, the gas can be used as an onsite fuel source, used for another useful purpose that a purchased fuel or raw material would serve, or routed to a flare or other control device that achieves at least 95 percent reduction in methane and VOC emissions. | Route associated gas to a sales line. If access to a sales line is not available, the gas can be used as an onsite fuel source, used for another useful purpose that a purchased fuel or raw material would serve, or routed to a flare or other control device that achieves at least 95 percent reduction in methane and VOC emissions. |
TABLE 20 FROM EPA METHANE PROPOSAL: SUMMARY OF PROPOSED EG SUBPART OOOOc PRESUMPTIVE NUMERICAL STANDARDS
Designated Facility | Proposed Presumptive Mass-Based Standards in the Draft Emissions Guidelines for GHGs |
Storage Vessels: Tank Battery with PTE of 20 tpy or More of Methane | 95 percent control |
Pneumatic Controllers: Natural Gas Driven that Vent to the Atmosphere. | VOC and methane emission rate of zero. |
Wet Seal Centrifugal Compressors | 95 percent control |
Pneumatic Pumps: Natural Gas Processing Plants | Zero natural gas emissions from diaphragm and piston pneumatic pumps. |
Pneumatic Pumps: Locations Other Than Natural Gas Processing Plants |
95 percent control of diaphragm pneumatic pumps if there is an existing control or process on site. 95 percent control not required if (1) routed to an existing control that achieves less than 95 percent or (2) it is technically infeasible to route to the existing control device or process |
Associated Gas from Oil Wells | Route associated gas to a sales line. In the event that access to a sales line is not available, the gas can be used as an onsite fuel source, used for another useful purpose that a purchased fuel or raw material would serve, or routed to a flare or other control device that achieves at least 95 percent control. |
TABLE 21 FROM EPA METHANE PROPOSAL: SUMMARY OF PROPOSED EG SUBPART OOOOc PRESUMPTIVE NON-NUMERICAL STANDARDS
Designated Facility | Proposed Presumptive Non-Numerical Standards in the Draft Emissions Guidelines for GHGs |
Fugitive Emissions: Well Sites >0 to <3 tpy methane |
Perform fugitive emissions survey and repair to demonstrate actual site emissions are reflected in calculation. |
Fugitive Emissions: Well Sites
≥3 tpy methane |
Quarterly OGI monitoring following Appendix K. (Optional quarterly EPA Method 21 monitoring with 500 ppm defined as a leak). First attempt at repair within 30 days of finding fugitive emissions. Final repair within 30 days of first attempt. |
(Co-proposal) Fugitive Emissions: Well Sites
≥3 to <8 tpy methane |
Semiannual OGI monitoring following Appendix K. (Optional semiannual EPA Method 21 monitoring with 500 ppm defined as a leak). First attempt at repair within 30 days of finding fugitive emissions. Final repair within 30 days of first attempt. |
(Co-proposal) Fugitive Emissions: Well Sites
≥8 tpy methane |
Quarterly OGI monitoring following Appendix K. (Optional quarterly EPA Method 21 monitoring with 500 ppm defined as a leak). First attempt at repair within 30 days of finding fugitive emissions. Final repair within 30 days of first attempt. |
Fugitive Emissions: Compressor Stations |
Quarterly OGI monitoring following Appendix K. (Optional quarterly EPA Method 21 monitoring with 500 ppm defined as a leak). First attempt at repair within 30 days of finding fugitive emissions. Final repair within 30 days of first attempt. |
Fugitive Emissions: Well Sites and Compressor Stations on Alaska North Slope. |
Annual OGI monitoring following Appendix K. (Optional annual EPA Method 21 monitoring with 500 ppm defined as a leak). First attempt at repair within 30 days of finding fugitive emissions. Final repair within 30 days of first attempt. |
Fugitive Emissions: Well Sites and Compressor Stations. |
(Optional) Alternative bimonthly screening with advanced measurement technology and annual OGI monitoring following Appendix K. |
Pneumatic Controllers: Alaska (at sites where onsite power is not available-continuous bleed natural gas driven) | Natural gas bleed rate no greater than 6 scfh. |
Pneumatic Controllers: Alaska (at sites where onsite power is not available - intermittent natural gas driven) | Monitor and repair through fugitives program. |
Reciprocating Compressors | Replace the reciprocating compressor rod packing based on annual monitoring (when measured leak rate exceeds 2 scfm) or route emissions to a process. |
Equipment Leaks at Gas Plants | Bimonthly OGI LDAR program (NSPS VVa as optional alternative). |
- Partner
Shannon is the managing partner of the firm’s San Francisco office and a trusted advisor to her clients. As the leader of our California environmental practice and co-leader of our nationwide environmental, social, and ...
- Counsel
Clare has experience in an array of regulatory matters related to transportation and energy industry project permitting, construction, recordkeeping and regulatory compliance. She has assisted a diverse set of clients—from ...
- Partner
Chuck Knauss has been repeatedly lauded by clients in Chambers USA. From 2011 through 2023, Chambers USA has reported that Chuck impresses clients with his “extraordinary strategic and analytical capabilities—he finds ...
- Partner
Matt advises and defends clients across industries with the strategic insights as former General Counsel for the US Environmental Protection Agency, former General Counsel for the Florida Department of Environmental Protection ...
Search
Recent Posts
Categories
- Agreements
- Air
- Batteries
- California
- Carbon
- Carbon Markets
- CERCLA
- Chemicals
- Climate
- Coal
- Duty to Defend
- Election
- Endangered Species
- Energy Transition
- Enforcement
- Environmental
- Environmental Justice
- Environmental Law
- EPA
- ESG
- General
- General Liability
- Manufacturing
- Mining
- Natural Resources
- Oil & Gas
- PFAS
- Policy
- Renewables
- Trade Agreements
- Utilities
- Waste
- Water
Tags
- 2015 Standards
- 2018 Farm Bill
- 2020
- 2020 Presidential Election
- 2022 Scoping Plan for Achieving Carbon Neutrality
- 316(b)
- 3D Printer
- 3D Printing
- 4(d) Rule
- 404
- 404 permits
- 404(g)
- 45Q
- AB 1200
- AB 2503
- AB 617
- Abeyance
- ABS
- ACE
- Acrylonitrile-Butadiene-Sytrene
- active guidance
- ADAO
- Adaptation
- adjacent
- Administration
- Administrative Agencies
- Administrative Law
- Administrative Procedure Act
- Administrator Pruitt
- Adverse Modification
- Advertizing
- Advisory Opinions
- Affordable Clean Energy
- Aftermarket Parts
- Agency
- Agency Budget
- Agency for Toxic Substances and Disease Registry
- Agency Guidance
- Agency Interpretation
- Agent
- Agriculture Improvement Act of 2018
- Air
- Air Emissions
- Air Permit
- Air Pollution
- Air Quality
- Air Quality Implementation Plan
- Air Quality Management District
- Air Quality Management Plan
- ALARP
- Alexandria Ocasio-Cortez
- Algae
- Allco Finance Unlimited v. Klee
- Allegheny
- Alternative Energy Portfolio
- Alternative Energy Portfolio Standard
- Ambient Air
- Amendments
- America's Water Infrastructure Act
- American Bar Association
- American Jobs Plan
- AMLO
- Anadarko Petroleum
- Andrés Manuel López Obrador
- Annie Kuster
- Anthony Kennedy
- Anti-Backsliding
- Anti-terrorism
- Antibacterial
- Antitrust
- AOC
- APA
- Appropriations
- APS
- AQMP
- Aquaculture
- Arbitration
- Arctice Grayling
- Army Corps of Engineers
- ARPA-E
- Articles
- Artificial Island transmission project
- Asbestos
- Asbestos Disease Awareness Organization
- Assumption
- Atlantic Coast Natural Gas Pipeline
- Audubon Society
- Auer
- Auer Deference
- Auxiliary Emissions Control Devices
- BAAQMD
- Backstop Siting
- BACT
- Bag Ban
- Bald and Golden Eagle Protection Act
- Bankruptcy
- BART
- Baseload
- Batteries
- battery storage
- Bay Area Air Quality Management District
- Beauty products
- Beneficial Use
- Beneficial Use and Reuse
- Bernie Sanders
- Best Available Control Technologies
- Beto O'Rourke
- BGEPA
- Biden Administration
- Bilateral Investment Treaty
- Biological Opinion
- Bipartisan Budget Act
- BIT
- Black-Capped Vireo
- BLM
- Blue Ribbon Task Force
- BOEM
- BOP
- Boston
- Boundary
- Brand Memo
- Brent Spar
- Brett Kavanaugh
- Brownfields
- BSEE
- Budget Proposal
- Bureau of Land Management
- Bureau of Ocean Energy Management
- CAA
- CAISO
- Cal-OSHA
- CalEPA
- California
- California Air Resources Board
- California Coastal Act
- California Consumer Protection Act of 2018
- California Department of Public Health
- California Department of Toxic Substances
- California Environmental Protection Agency (CalEPA)
- California Environmental Public Health and Workers Defense Act of 2019
- California Environmental Quality Act
- California Legislature
- California Mining
- California Ocean Protection Council
- California OEHHA
- California Proposition 13
- California Proposition 65
- California Regional Water Quality Control Boards
- California State Lands Commission
- California State Water Resources Control Board
- California Superior Courts
- California Title 8
- California Water Code section 13304
- California's Safe Drinking Water and Toxic Enforcement Act
- California-China Clean Technology Partnership
- Cannabis
- Cap In Place
- Cap-and-Trade
- Capital Asset Pricing Model
- CAPP
- CARB
- Carbon Capture
- Carbon Capture and Sequestration
- Carbon Capture Demonstration Projects Program
- Carbon Capture Large-Scale Pilot Projects
- Carbon Capture Utilization and Storage
- Carbon Credits
- Carbon Dioxide
- carbon dioxide removal
- Carbon Intensity
- Carbon Markets
- Carbon Nanotubes
- Carbon Utilization
- CASAC
- Categorical Exclusion
- CBD
- CBI
- CCPA
- CCPS
- CCR
- CCR Rule
- CCS
- CCS Alliance
- CCUS
- CDP
- CDR
- CECP
- CEJST
- Center for Chemical Process Safety
- Centralized Waste Treatment
- CEQ
- CEQA
- CERCLA
- Certificate of Public Convenience and Necessity
- Certification
- Certified Unified Program Agencies
- CESER
- CFATS
- CFCs
- CFE
- CGL
- Chambers USA
- Chapter 91
- Chemical Data Reporting
- Chemical Exposure
- Chemical Risk Assessment
- Chemical Safety Board
- Chemicals
- Cheryl LaFleur
- Chevron Deference
- Cheyenne River Sioux
- Chloroflourocarbons
- Chlorpyrifos
- Chrysotile Asbestos
- CIP
- Circular Economy
- CITES
- Citizen Petition
- Citizen Suit
- Civil Penalties
- Civiletti
- Claims-Made
- Class VI
- Class VI Primacy
- Class VI Underground Injection Control
- Clean Air Act
- Clean Development Mechanism
- Clean Energy
- Clean Energy Standard
- Clean Hydrogen
- Clean Peak Energy Certificates
- Clean Power Plan
- Clean Water Act
- Clean Water Act Section 401
- Clean Water Act Section 404
- Cleaning Products
- Cleanup
- Climate
- Climate Change
- Climate Disclosure
- Closure by Removal
- CNTs
- CO2
- CO2 Emissions
- Coakley Order
- Coal
- Coal Ash
- Coal Ash Basins
- Coal Combustion Residuals
- Coal Leasing Moratorium
- Coal Mine Health and Safety Act
- Coalition for Competitive Electricity v. Zibelman
- Coastal
- Coastal Zone Management Act
- Comisión Federal de Electricidad
- Commercial General Liability
- Commercial Information
- Common Law
- Community Air Protection Program
- Compliance
- Comprehensive Environmental Response Compensation and Liability Act
- concurrent-remedies doctrine
- Confidential Business Information
- Congress
- Congressional Research Service
- Congressional Review Act
- Consent Decree
- Conservation Easement
- Considerations
- Constitutional Law
- Consultation
- Consumer Data
- Consumer Product Exposure Warnings
- Consumer Products
- Consumer Products Safety Commission
- Contaminated Sites
- Contribution Threshold
- Controlled Substances Act of 1970
- Cook Inlet
- Cookware
- Cooling Water Intake Structures
- Cooperative Federalism
- COP26
- COP28
- COP28 Agreement
- Coronavirus/COVID-19
- Corporate Governance
- Corporate Social Responsibility
- Corporate Sustainability
- Corporate Sustainability Reporting Directive
- Corporate Sustainability Reporting Directive (CSRD)
- Corporate Valuation
- Corps
- Cosmetics
- Cost of regulation
- Council on Environmental Quality
- County of Maui
- COVID-19
- CPCN
- CPECs
- CPP
- CPS
- CPSC
- CPUC
- CRA
- Criminal Enforcement
- Critical Electric Infrastructure Information
- critical habitat
- Critical Habitat Designation
- Critical Infrastructure
- Critical Infrastructure Protection
- Cross-State Air Pollution Rule
- CSA
- CSAG
- CSAPR
- CSB
- CSR
- CSR reports
- CSR Standards
- CSR- and ESG-related risks
- Cultural Resources
- CWA
- CWA Citizen Suit
- CWA section 401
- CWA Section 404
- Cyber-Related Risks
- Cybersecurity
- D&O
- D&O Insurance
- Dakota Access Pipeline
- DAPL
- DARTIC
- Data Security
- DC Circuit
- DC Circuit Court of Appeals
- DCH
- Deadline Suits
- Deadlines
- Decarbonization
- Decommissioning
- Deep-Well Injection
- Deepwater Horizon
- Defeat Devices
- Defense Costs
- Deference
- Deidre G. Duncan
- Delisting
- Democratic Debate
- DEP
- Department of Energy
- Department of Homeland Security
- Department of Justice
- Department of Labor
- Department of the Interior
- Department of Transportation
- Designations
- Development
- Device
- Diligent Prosecution
- Dioxane
- Directors & Officers
- Director’s Order
- Discharge
- Diversity and Inclusion
- DJSI
- DOD
- DOE
- DOER
- DOI
- DOJ
- DOJ ENRD
- Domestic Energy Policy
- Domestic Terrorism
- DOSH
- Dow Jones Sustainability Index
- DPR
- DPU
- Draft
- Draft EA
- Draft Environmental Assessment
- drinking water
- Drought
- DTSC
- Due Diligence
- Duke Energy
- Duty to Defend
- Dynamic Scoring
- E&P Wastes
- EA
- eagle
- Eagle Take Permit
- Earth Day
- Economic Impact
- Economic Impacts
- Effluent
- Effluent Guidelines
- Effluent Limitations
- EHSS
- EIS
- EJSCREEN
- Election 2020
- Electric Ratepayers
- Electric Transmission
- Electric Vehicles
- Electricity
- Electricity Markets
- ELG
- ELGs
- Elizabeth E. Aldridge
- Elizabeth Warren
- Emergency Planning and Community Right-to-Know Act
- Emergency Response
- Emergency Support Functions
- Emerging Contaminants
- Emission Caps
- Emission Control Requirements
- Emission Reduction Credits
- Emissions
- Emissions Caps
- emissions reporting
- Emphasis List
- Endangered Species
- Endangered Species Act
- Energy
- Energy Industry
- Energy Infrastructure
- Energy Package Insurance
- Energy Reforms
- Energy Storage
- Energy Transition
- Enforcement
- Enforcement Discretion
- Enforcement statistics
- Engine Certification
- Enhanced Oil Recovery
- ENRD
- Environment
- Environment and Natural Resources Division
- Environmental
- Environmental and Social Governance
- Environmental Appeals Board
- Environmental Assessment
- Environmental Bar
- Environmental Compliance
- Environmental Crimes
- Environmental Defense Fund
- Environmental Disclosure
- Environmental Due Diligence
- Environmental Enforcement
- Environmental Groups
- Environmental Impact Statement
- Environmental Justice
- Environmental Justice and Equity Board
- Environmental Law
- Environmental Law Institute
- Environmental Markets
- Environmental Permitting
- Environmental Protection Agency
- Environmental Rights
- Environmental Social and Corporate Governance
- Environmental Social and Governance
- Environmental Social Governance
- Environmental Social Justice
- Environmental Transactions
- EO 13891
- EOR
- EP3
- EP4
- EPA
- EPA audit policy
- EPR
- EPR Laws
- Equator Principles
- Equator Principles Association
- ERC
- ESA
- ESA consultation
- ESA section 7 consultation
- ESG
- ESG Diligence
- ETP
- EU
- European Climate Law
- European Green Deal
- European Sustainability Reporting Standards
- European Union
- Evaluation of Regionalization for Potential New Wastewater Systems
- EVs
- Exceptional Events
- Exceptional Events Rule
- Excess Insurance
- Excess Liability
- Exchange Act
- Executive Compensation
- Executive Memorandum
- Executive Office for United States Attorneys
- Executive Order
- Executive Order 13777
- Executive Order 14008
- Executive Order N-8-23
- Executive Orders
- Extended producer Responsibility
- Fair and Equitable Treatment
- Fair Labor Standards Act
- FAST Act
- Fathead Minnow
- Fatmucket Mussel
- FDA
- FECM
- Federal Action
- Federal Agencies
- Federal Agency Action
- Federal Budget
- Federal Energy Regulatory Commission
- Federal Lands
- Federal Permit
- Federal Power Act
- Federal Preemption
- Federal Register
- Federal Rule 20
- Federal Rule 71.1
- Federalism
- Fees
- FERC
- FET
- Fiduciary Liability
- FIFRA
- Fifth Circuit
- Final Rule
- Financial Information
- Fireworks
- First Amendment
- Fishing Industry
- Flaring
- Flint
- FloaTEC LLC
- Flood Infrastructure Funding
- Flood Mitigation
- Florida
- FLSA
- FOIA
- Food
- Food and Drug Administration
- Food and Drug Administration (FDA)
- Food Loss and Waste
- Food Marketing Institute
- Food Marketing Institute v. Argus Leader Media
- Food Waste
- Food Waste Reduction Alliance
- Fossil Fuels
- Fourth Circuit
- Fourth of July
- FPA
- FPA Preemption
- FPA section 202(c)
- FPOS
- Fracking
- Framework
- Framework Rule
- Fraud
- Free Trade Agreement
- Freedom of Information Act
- Freeport
- FSLA
- FTA
- Funding for Environmental Protection
- Funding Mechanism
- FUTURE Act
- FWS
- FY2017 budget
- FY2018
- GAO
- Gas
- GDPR
- Gender Equality
- General Data Protection Regulation
- General Industrial Stormwater Permit
- General Permit
- GenX
- George Clemon Freeman Jr.
- GHG
- GHG Emissions
- GHG Emissions Renewable Portfolio Standard
- Gilbert & Sullivan
- Global Carbon Markets
- Global Climate Negotiations
- Global Reporting Initiative
- Global Warming Solutions Act
- Glyphosate
- GOM
- Good Neighbor Obligation
- Good Neighbor Provision
- Government Investigations
- Grand River Dam Authority
- Grassroots Activisim
- Green Admendment
- Green Communities Act
- Green Deal
- Green New Deal
- Green New Deal; Climate Change
- Greenhouse Gas
- Greenhouse Gas Emissions
- Greenhouse Gas Protocol
- Greenhouse Gas Protocol Initiative
- Greenhouse Gases
- Grid
- grid reliability
- grid study
- Grocery Manufacturers Association
- Groundwater
- Guam
- Guidance
- Guidance Portal
- Gulf of Mexico
- Habitat
- Hardrock Mining Rule
- Harmful Algal Blooms
- Hawaii
- Hawkes
- Hazardous Air Pollutants
- Hazardous Materials Regulations
- Hazardous Waste
- HBCD
- HCFCs
- Health
- Health Advisories
- health advisory
- Health and Safety
- HECT
- Hemp
- HFCs
- high-density polyethylene (HDPE)
- Highly Reactive Volatile Organic Compound Emissions Cap and Trade
- Historical Matter
- HMR
- Holder
- Homeland Security
- Hoopa Valley Tribe
- House
- House of Representatives
- Houston Casualty
- Human Health Toxicity Values
- Human Rights
- Hurricane Harvey
- Hydraulic Fracturing
- Hydroelectric Relicensing
- Hydrofluorocarbons
- Hydrofluorocarbons (HFCs)
- Hydrogen
- Hydrogen Energy Earthshot
- Hydrological Connection Theory
- Hydropower
- ICMM
- ICSID
- IFC Performance Standards
- IGP
- IIA
- IIJA
- Impaired Waterbodies
- Impaired Waters
- Impairment
- Incident Response
- Incidental Take
- incidental take statement
- Indian Lands
- Indigenous Traditional Ecological Knowledge
- Indonesia
- Industrial Accidents
- Industrial Hemp
- Infectious Disease Preparedness and Response Plan
- Inflaction Reduction Act
- Infrastructure
- Infrastructure Development
- Infrastructure Investment and Jobs Act (IIJA)
- infrastructure security
- Initial & Boundary
- Innovation
- Inside Look
- Inspections
- Insurance
- Insurance Recovery
- Integrated Science Assessment
- Interagency Review
- Intergovernmental Panel on Climate Change
- Interior
- International Arbitration
- International Centre for Settlement of Investment Disputes
- International Council on Mining and Metals
- International Energy Agency
- International Environmental Law
- International Investment Agreements
- International Petroleum Industry Environmental Conservation Association
- Interstate Transport
- Intervention
- Investment Risk Assessment
- IPCC
- IRIS
- IRIS Review
- IRS
- ISO-NE
- ITEK
- Jay Inslee
- Jewell
- Joe Biden
- John Hickenlooper
- Joint Venture Provision
- Judicial Review
- Judiciary
- Jurisdiction
- Jurisdictional Determination
- Justice40
- Kamala Harris
- Kavanaugh
- Kenk’s amphipod
- Kevin McIntyre
- Keystone XL
- Kigali Amendment
- Kisor
- Kisor Deference
- Kyoto Protocol
- Lake Erie
- Lake Powell Pipeline Project
- Lampsilis Siliquoidea
- Land Use
- Late Notice
- Lautenberg Act
- Law360
- LCPFAC SNUR
- LDC
- LDNR
- Lead
- Lead and Copper Rule
- Lease Sale
- Legislation
- Lesser Prairie Chicken
- Li-ion
- Liability
- Liability Insured
- Linear
- Liquefied Natural Gas
- Lithium-ion batteries
- Litigation
- Lloyds
- Lloyd’s of London
- LNG
- London Protocol
- Long-Form Warning
- Look-back period
- Louisiana Department of Natural Resources
- Low Carbon Fuel Standard
- MA DOER
- Maine Department of Environmental Protection
- Maintenance Fees
- Malaysia
- Manufactured Products
- Manufacturing
- Marijuana
- Maritime
- Markets
- Masias
- Mass Emissions Cap and Trade
- Massachusetts
- Massachusetts AG
- Massachusetts Clean Energy Center
- Massachusetts Climate Act
- Massachusetts Department of Energy Resources
- Massachusetts Global Warming Solutions Act
- MassCEC
- MATS
- Maximum Contaminant Levels
- MBTA
- MBTA; Wind Energy; Renewable Energy; protected species; natural resources; USFWS
- McGraw-Edison
- McIntyre
- MCL
- MCLG
- MCLs
- McNamee
- MEA
- MECT
- Mergers & Acquisitions
- Methane
- methane emissions
- Methane Repeal Rule
- Methylene Chloride
- Michigan
- microplastics
- Midnight Rule
- Midstream
- Migratory Bird Treaty Act
- Migratory Birds Treaty Act
- Millennium Pipeline
- Mineral Leasing Act
- Mining
- Mining Claims
- Minnesota Pollution Control Agency (MPCA)
- Misbranding
- Mitigation
- Mitigation Rule
- MLP
- Modification
- Monitoring
- Monsanto
- Montana
- Montreal Protocol
- Moratorium
- MOU
- Mountain Valley Pipeline
- MSGP
- Multi-Sector General Permit
- Multiyear Plan for Energy Sector Cybersecurity
- Mulvaney
- Murray
- Murray Energy
- MVP
- NAAQS
- NAFTA
- NAIOP
- NALs
- Nancy Pelosi
- NATA
- National Ambient Air Quality Standards
- National Compliance Initiatives
- National Cybersecurity and Communications Integration Center
- National Defense Authorization Act
- National Determined Contributions
- National Emergency
- National Enforcement and Compliance Initiatives
- National Enforcement Initiatives
- National Environmental Policy Act
- National Historic Preservation Act
- National Hydro Association
- National Marine Fisheries Service
- National Oceanic Atmospheric Administration
- National Parks and Conservation Ass’n v. Morton
- National Petroleum Council
- National Pollutant Discharge Elimination System
- National Pollutant Discharge Elimination System (NPDES)
- National Pollution Discharge Elimination System
- National Primary Drinking Water Regulation
- National Priorities List
- National Recycling Strategy
- National Register of Historic Places
- National Restaurant Association
- National Security
- Nationwide Permit
- Native American Law
- Natural Gas
- Natural Gas Act
- Natural Gas Leak Abatement Program
- Natural Gas Pipeline Certification
- Natural Gas Pipelines
- Natural Resource Damages
- Natural Resources
- Navigable waters
- NCCIC
- NCI
- NEC
- NECIs
- NEI
- Neil Chatterjee
- NELs
- NEPA
- NEPA Policy
- NEPA Review
- NERC
- NESCOE
- Net-Zero Emissions
- Net-Zero Greenhouse Gas Emissions
- New Chemicals Review Program
- New Rule
- New Source Review
- New York
- New York Department of Environmental Conservation
- New York State Department of Taxation and Finance
- NGA
- NGO
- NHPA
- NHTSA
- NIETC
- nitrogen dioxide
- NMFS
- No Exposure Certification Identification Number
- No-Action Letter
- NOAA
- NOI
- NONA
- Nonapplicability Identification Number
- Nonattainment
- Nonpoint Source
- North American Electric Reliability Corporation
- North Dakota
- Notice
- Notice of Proposed Rulemaking
- NPDES
- NPDES Delegation
- NPDWR
- NPL
- NSPS
- NSR
- nuclear
- nuclear energy
- NWP
- NY PSC
- Obama
- Occupational Safety and Health Act
- Occupational Safety and Health Administration
- OCE
- OECA
- OEHHA
- OEJECR
- Office of Civil Enforcement
- Office of Cybersecurity Energy Security and Emergency Response
- Office of Electricity Delivery & Energy Reliability
- Office of Enforcement and Compliance Assurance
- Office of Enforcement and Compliance Assurance (OECA)
- Office of Environmental Justice and External Civil Rights
- Office of Federal Register
- Office of Information and Regulatory Affairs
- Office of Management and Budget
- Office of Natural Resources
- Office of Water
- Offshore Energy
- Offshore Platforms
- Offshore Wind
- Offshore wind energy
- Ohio
- Oil
- Oil & Gas
- Oil and Gas
- Oil and Gas Production
- Oil and Gas Wastewater
- Oil Pipelines
- Oil Pollution Act
- OIRA
- Oklahoma
- OMB
- One Federal Decision
- One Federal Plan
- OPA
- OSHA
- Outer Continental Shelf
- OW
- Ozone
- Pacific OCS Region
- Packaging
- Paperwork Reduction Act
- Paris Agreement
- Paris Climate Accord
- Paris Climate Agreement
- Particulate Matter
- Partido Revolucionario Institucional
- Passaic River
- PATH Act
- PBT
- PCBs
- PEMEX
- Penalties
- Penalty
- PennEast Pipeline
- Pennsylvania
- Perfluoroalkyl
- Permian Basin
- Permitting
- Pesticide Devices
- Pesticides
- Pete Buttigieg
- Petition
- Petition for Rulemaking
- Petitions for Objection
- PetraNova
- Petrochemical Regulation
- Petróleos Mexicanos
- Petroleum Products
- PFAS
- PFAS Action Plan
- PFAS in Products State Law Tracker
- PFAS Reporting Rule
- PFAS Strategic Roadmap
- PFBA
- PFBS
- PFNA
- PFOA
- PFOS
- PHMSA
- Physicians for Social Responsibility
- Pimphales Promelas
- PIP
- Pipe Manufacturing
- Pipeline
- Pipeline and Hazardous Materials Safety Administration
- Pipeline Attacks
- Pipeline Construction
- Pipeline Safety
- Pipelines
- PIPES
- Plastic
- Plastic Carryout bag
- PNAS
- POCSR
- Point Source
- Point Source Discharge
- Policy
- Policy Statement
- Pollution
- Pollution Exclusion
- Pollution Liability
- Pollution Prevention for Healthy People and Puget Sound Act
- Polyalkyl
- Polyfluoroalkyl
- Port of Los Angeles
- Porter-Cologne Water Quality Control Act
- Potentially Responsible Party
- POTW
- PRA
- Practical Law
- Precedent
- Preconstruction Authorizations
- Preemption
- Prejudice
- Preliminary Injunction
- President Biden
- President Trump
- Presidential Transition
- PRGs
- PRI
- Priebus
- Principal
- Principles for Responsible Investments
- Priority Pollutants
- Privacy
- Process Safety Management
- Produced Water
- Product Safety
- Production Cuts
- Production Sharing Contract
- Prohibition on Sale
- Project Development
- Prop. 65
- Proposition 65
- Protected Species
- Protecting Our Conserved Lands Act of 2019
- PRP
- Pruitt
- Pruitt Task Force
- PSC
- PSD
- PSH
- PSM
- Public Comment
- Public Lands
- Public Utilities
- Publicly Owned Treatment Works
- Pumped Storage Hydropower
- PURPA
- Quality Assurance Plan
- R-Project Transmission Line
- Racing Vehicles
- RAGAGEP
- Railroad Commission
- Railroad Commission of Texas
- Railroad Commission of Texas (RRC)
- Rapanos
- RBI
- RCRA
- RCRA Subtitle D
- REACH
- Reasonable Progress Plans
- RECLAIM
- Reconsideration
- RECs
- Redevelopment
- Refinery
- Reform
- Reforma Energética
- Regional Clean Air Incentives Market
- Regional Clean Hydrogen Hubs
- Regional Greenhouse Gas Initiative (RGGI)
- Regional Haze
- Regional Water Quality Control Boards
- Registration Evaluation Authorization and Restriction of Chemicals
- Regulation
- Regulation S-K
- Regulation S-X
- Regulations
- Regulatory
- Regulatory Agenda
- Regulatory Freeze
- Regulatory Guidance
- Regulatory Programs
- Regulatory Reform
- Regulatory Review
- Reliability
- Reliability Safety Valve
- Remediation
- Removal Action
- Renewable
- Renewable Energy
- Renewable Energy Certificates
- Renewable Energy Portfolio
- Renewable Fuel Standards
- Renewable Portfolio Standard
- Renewables
- Renewals
- Reporting
- Request for Information
- ReRED
- Rescind
- Resilience of the Bulk Power System
- Resource Conservation and Recovery Act
- Responsible Business Initiative
- Restoration
- Restriction of Hazardous Substances
- Retail
- Retailers
- Retained
- Retroactivity
- Return on Equity
- RFS
- RHA
- Richard Glick
- Rigs to Reefs
- RIN
- Ripeness
- Risk and Technology Review
- Risk Assessment
- Risk Evaluation
- Risk Management
- Risk Management Plan
- Risk Management Program
- Risk Management Regulations
- Rivers and Harbors Act
- RMP
- Roadmap Release
- Roanoke River Basin Association
- Robert Powelson
- ROE
- ROEs
- RoHS
- Roundtable on Sustainable Palm Oil
- Roundup
- Royalties
- RPS
- RRBA
- RRC
- RTR
- Rule 14a-8(i)(7)
- Rule 65(c)
- Rulemaking
- Russia
- SAB
- Sacred Sites
- SAFE
- Safe Drinking Water Act
- Safe Harbor
- Safe Harbor Regulation
- Safe Harbor Warning
- Safer Consumer Products
- SAFETY Act
- Safety Management System
- San Francisco Bay Regional Water Quality Control Board
- SASB
- SaskPower’s Boundary Dam Unit 3
- SB 1371
- SCAQMD
- Science
- Science Advisory Board
- Science Advisory Board (SAB)
- Scope
- Scope 1
- Scope 2
- Scope 3
- Scott Pruitt
- SCOTUS
- SDWA
- SEC
- Section 10
- Section 104 Request
- Section 114 Request
- Section 179B(b)
- Section 208 Request
- Section 308 Request
- Section 4
- Section 401
- Section 404
- Section 408
- Section 45Q
- Section 5
- Section 6(b)
- Securities Act
- Securities and Exchange Commission
- Securities and Exchange Commission (SEC)
- Securities Law
- Seismicity
- Seminole Rock
- Senate
- Senate Energy and Natural Resources Committee
- Senator Lamar Alexander
- SEP
- SEPs
- Services
- Settlements
- Sewage
- Shareholder Lawsuits
- Shutdown
- Sierra Club
- Significant Figures
- Significant Guidance
- Significant New Use Rule
- SIP
- Smelter
- SNUR
- Social
- Social Media
- Solar
- Solid Waste
- South China Sea
- South Coast Air Quality Management District
- SPCC
- Species
- Spill Prevention Control and Countermeasure Rule
- SSB 5135
- SSM SIP Call
- Stabilization Clause
- Standing
- Standing Rock Sioux
- Stare Decisis
- State
- State Administrative Appeals
- State Air Pollution Control Board
- State Constitutions
- State Environmental Quality Review Act
- State Implementation Plan
- State Law
- State Water Resources Control Board
- States
- Statute of Limitations
- Statutory Authority
- Statutory Interpretation
- Stormwater
- Strategic
- Straw Proposal
- Subrogation
- sulfur dioxide
- Sunset Review
- Superfund
- Supplemental Environmental Projects
- Supply Chain
- Supreme Court
- Supreme Court of Texas
- Supreme Court of the United States
- Surface Mining Act
- Surface Water Discharge
- Susan Bodine
- Sustainability
- Sustainability Accounting Standards Board
- Sustainable Development Goals
- Sustainable Investing
- SWDA
- Switzerland
- SWRCB
- Tailings Storage Facility
- Take
- Take Prohibition
- Takings
- Task Force on Climate-Related Financial Disclosures (TCFD)
- Tax
- Tax Credits
- Tax Cuts and Jobs Act
- Tax Reform
- Taxonomy Regulation
- TCEQ
- TCI
- Temporary Policy
- TERP
- Texas Alliance of Energy Producers
- Texas Commission on Environmental Quality
- Texas Legislature
- Texas Railroad Commission
- Texas Water Development Board
- Thailand
- THC
- The European Commission
- The Mikado
- The Treasury Department
- The Water Infrastructure Improvements Act
- the WIIN Act
- Third Circuit
- Threatened Species
- Title V
- TMDL
- TMDLs
- TNALs
- Toledo
- Tolling Order
- Total Maximum Daily Load
- Toxic Chemicals
- Toxic Substances Control Act
- Toxic Substances Control Act (TSCA)
- Toxics
- Toxics Release Inventory
- Transcos
- Transition
- Transmission
- Transparency
- Transport
- Treasury
- Treaty Rights
- Trends
- TRI
- Tribal Rights
- Tribes
- Trump
- Trump Administration
- TSA
- TSCA
- TSF
- TWDB
- U.S. Army Corps of Engineers
- Ultimate Net Loss
- UNCLOS
- Underground Injection Wells
- Underground Storage Tank
- UNFCCC
- Unified Agenda
- United Airlines
- United Nations
- United Nations Framework Convention on Climate Change
- Urgenda
- US Army Corps of Engineers
- US Chemical Safety Board
- US Climate Alliance
- US Court of Appeals for the Ninth Circuit
- US Customs and Border Protection
- US Department of Agriculture
- US Department of Justice (DOJ)
- US Environmental Protection Agency
- US Fish and Wildlife Service
- US FWS
- US SAFETY Act
- US Securities and Exchange Commission
- US Securities and Exchange Commission (SEC)
- US Supreme Court
- USACE
- USDA
- USDOT
- USFWS
- USMCA
- Utilities
- utility
- vapor intrusion
- Vapor Recovery Units
- VCP
- venting
- Veto
- Village of Old Mill Creek. v. Star
- Vineyard Wind
- Virginia Clean Economy Act
- Virginia Community Flood Preparedness Fund
- Virginia Department of Environmental Quality
- Virginia State Corporation Commission
- vision of Corporation Finance
- VOCs
- Volatile Organic Compounds
- Voluntary Cleanup Program
- Voluntary Remediation
- Waiver
- Waiver Period
- Warnings
- Washington
- Waste
- Waste Discharge Identification Number
- Waste Electrical and Electric Equipment
- Waste Permitting
- Wasted Food
- Wastewater
- Wastewater Treatment
- Water
- Water Quality Certification
- Water Quality Criteria
- Water Regulation
- Water Reuse
- Water Supply and Management
- Water Systems
- Waterfront
- Waters
- Waters of the United States
- WDID
- WEA
- WEEE
- Well Blowout
- Well Control Rule
- WET Tests
- Wetlands
- Whole Effluent Testing
- Wholesale Electricity
- WildEarth Guardians
- Wildfire
- Wind
- Wind Energy
- Wind Energy Area
- wind farms
- Winning on Reducing Food Waste Initiative
- Winter v. NRDC
- Withdrawal or Reinstatement
- World Bank Group Equator Principles
- Worst-Case Discharge
- WOTUS
- WQBELs
- WQC
- Wyoming
- Zero Emissions
- Zero-Emissions Vehicle Initiative
- Zinke
Authors
- Yaniel Abreu
- Elizabeth E. Aldridge
- Walter J. Andrews
- John J. Beardsworth, Jr.
- Nancy B. Beck, PhD, DABT
- Jordan L. Bernstein
- Timothy E. Biller
- George Borovas
- Lawrence J. Bracken II
- Shannon S. Broome
- Karma B. Brown
- Samuel L. Brown
- F. William Brownell
- Courtney Cochran Butler
- Julia J. Casciotti
- Michelle G. Chan
- E. Carter Chandler Clements
- Abigail Contreras
- Benjamin Y. Cooper IV
- Christopher J. Cunio
- Alexandra B. Cunningham
- Andrea DeField
- Meredith Doswell
- Douglas L. Dua
- Deidre G. Duncan
- Frederick R. Eames
- Clare Ellis
- Latosha M. Ellis
- Susan S. Failla
- Geoffrey B. Fehling
- Andrea Field
- Hannah Flint
- Steven C. Friend
- Kevin E. Gaunt
- Andrew G. Geyer
- Erin Grisby
- Elisabeth R. Gunther
- Steven M. Haas
- Alexandra Hamilton
- Patrick Jamieson
- Kevin W. Jones
- Dan J. Jordanger
- Ryan T. Ketchum
- Sami M. Khan
- Jonathan H. Kim
- Scott H. Kimpel
- Charles H. Knauss
- Garrett Kral
- J. Pierce Lamberson
- Lucinda Minton Langworthy
- Jaclyn E. Lee
- Matthew Z. Leopold
- Charlotte Leszinske
- Brian R. Levey
- Michael S. Levine
- Elbert Lin
- Eric R. Link
- Nash E. Long
- David S. Lowman, Jr.
- Phyllis H. Marcus
- Jeffrey N. Martin
- Lorelie S. Masters
- Patrick M. McDermott
- Kerry L. McGrath
- Robert J. McNamara
- Michael J. Messonnier, Jr.
- Jennifer MikoLevine
- Todd S. Mikolop
- Angela Morrison
- Michael J. Mueller
- Eric J. Murdock
- Ted J. Murphy
- William L. Newton
- Henry V. Nickel
- Paul T. Nyffeler, PhD
- Peter K. O’Brien
- G. Michael O’Leary
- Evangeline C. Paschal
- Kate Perkins
- Shemin V. Proctor
- Shawn Patrick Regan
- Myles F. Reynolds
- Doris Rodríguez
- Brent A. Rosser
- Christian Rudloff
- Rachel Saltzman
- Arthur E. Schmalz
- Penny A. Shamblin
- Michael R. Shebelskie
- George P. Sibley, III
- Joseph C. Stanko
- Martin P. Stratte
- Javaneh S. Tarter
- Thomas W. Taylor
- Patricia Tiller
- Linda Trees
- Andrew J. Turner
- Emily Burkhardt Vicente
- Gregory R. Wall
- Thomas R. Waskom
- Malcolm C. Weiss
- Michelle-Ann C. Williams
- Susan F. Wiltsie