Posts tagged Well Control Rule.
Time 2 Minute Read

On August 22, 2023, the Department of the Interior (“DOI”) announced that the Bureau of Safety and Environmental Enforcement (“BSEE”) has issued the final Well Control Rule for drilling, workover, completion and decommissioning operations.  This final rule clarifies blowout preventer (“BOP”) system requirements, modifies certain specific BOP equipment capability requirements, and builds upon the regulatory reforms that were originally implemented by the DOI after 2010.  The BSEE is setting an effective date of 60 days following publication of the final rule, by which time oil and gas operators in the federally regulated outer Continental Shelf will be required to comply with most of the final rule’s provisions. Operators have a one-year deferred compliance date following publication of the final rule to equip subsea BOP stacks with the remotely operated vehicle intervention capability to both open and close each shear ram, ram locks, and one pipe ram as required by 30 CFR § 250.734(a)(4).  The final rule:

Search

Subscribe Arrow

Recent Posts

Categories

Tags

Authors

Archives

Jump to Page